Confirm responsibility
Review the strata plan, filed bylaws, alteration agreements and relevant records. Establish who arranges the work, who pays and who is authorized to instruct the contractor.
12233 92 Avenue, Surrey, British Columbia V3V 7R9, Canada
CALL US TODAY · 604-358-3436
FOR STRATA COUNCILS & PROPERTY MANAGERS
Plan the roof. Prepare the property.
Paragon Roofing BC replaces and installs roofs for Surrey strata properties, townhouses and apartment buildings. We help define the roofing scope, compare suitable systems and coordinate work around occupied buildings, from the initial assessment through completion.
START WITH THE CONDITION
A leak alone does not establish that every roof in the complex needs replacement. The decision should consider the condition of the covering and underlying assembly, recurring defects, earlier repairs and the consequences of delaying work.
A localized repair may be appropriate when the surrounding roof remains serviceable. Widespread deterioration, repeated failures or damage beneath the surface can require a broader replacement plan. Each building may need its own assessment.
If the immediate need is a leak or routine care, start with Surrey strata roof repair and maintenance. For the wider service overview, visit Surrey strata roofing.
START WITH YOUR BUILDING
Share the Surrey address, number of buildings, roof material if known, leak history and your role. Include available reports, access restrictions and the council’s meeting or tender deadline.
We will discuss the assessment needed, current availability and any applicable fee. Confirm photographs, written findings or meeting presentation requirements as part of the agreed scope.
BEFORE THE VOTE OR CONTRACT
Give the council enough information to approve a defined project. A depreciation report can inform long term planning, but its allowance is not a current construction quote or a substitute for assessing the roof.
Review the strata plan, filed bylaws, alteration agreements and relevant records. Establish who arranges the work, who pays and who is authorized to instruct the contractor.
Identify whether the project will use approved funds, the contingency reserve fund or a special levy. Confirm the applicable approval process before committing. The required vote depends on the decision and circumstances.
A change in material or roof appearance may require additional owner approval. Ask the City of Surrey about permits for the actual scope, especially structural work or broader building envelope remediation.
Roof replacement and remediation of water penetration damage can raise different requirements. Before tendering a broader envelope project, have the consultant confirm whether BC Housing licensing and warranty rules apply. Do not assume every roof replacement triggers the same requirements.
Use the Surrey strata roofing guide to organize the council’s planning questions. Confirm project specific approvals with the appropriate professional or authority.
CHOOSE AN ASSEMBLY, NOT JUST A SURFACE
Roof slope, drainage, deck condition, building use and existing details guide system selection. Compare the full proposed assembly and its installation requirements before comparing product names.
| Roof system | Typical application | Details to compare |
|---|---|---|
| SBS membrane | Low slope roofs with a specified modified bitumen assembly. | Membrane layers, attachment method, substrate, insulation, flashings and drainage. Confirm precautions for any hot work. |
| TPO membrane | Low slope roofs using a thermoplastic membrane with heat welded seams. | Membrane specification, attachment, insulation, seam verification and compatible penetration and edge details. |
| EPDM membrane | Low slope roofs using a rubber membrane and compatible seam and flashing products. | Attachment, substrate preparation, seam treatment, wall connections and drainage details. Explore Surrey rubber roofing. |
| Asphalt shingles | Sloped townhouse and apartment roofs where the product and assembly suit the roof pitch. | Decking, underlayment, flashings, ventilation, valleys and ridge details. Compare Surrey asphalt shingles. |
| Metal roofing | Roofs suited to the specified panel profile and assembly. | Slope limits, panel attachment, movement, transitions, penetrations and drainage. Review Surrey metal roofing. |
For a low slope building, the Surrey flat roofing guide explains the planning considerations. A material change should also account for the building’s structure, appearance and approval requirements.
THE CONNECTIONS MATTER
Ridges, roof edges and wall connections need a defined scope. Confirm how existing flashings meet the new roof and which adjoining components will remain.
COMPARE THE SAME WORK
A total price is meaningful when the included work is clear. Building count, roof area, height, slope, existing layers, access and concealed damage all affect cost. Separate firm scope from allowances and optional work.
| Scope item | What to confirm in writing |
|---|---|
| Buildings and removal | Identify included roofs, canopies and phases, existing layers to remove, debris handling and areas that remain. |
| Decking and hidden damage | Define the allowance or unit pricing, documentation and authorization process for damaged decking or concealed deterioration. |
| The new roof assembly | Specify the covering or membrane, underlayment or insulation, attachment and relevant installation requirements. |
| Flashings and drainage | Identify wall and edge flashings, penetrations, drains, scuppers, gutters and transitions. State what is replaced, retained or excluded. |
| Skylights and ventilation | List the units and components included, related flashing work and any ventilation changes. Separate other trade work. |
| Access and protection | Describe scaffolding or equipment, staging, occupied building protection, resident notices and permit responsibilities. |
| Price and closeout | Clarify taxes, allowances, payment terms, change approval, completion records and the specific workmanship and manufacturer warranty terms. |
Ask each bidder to explain differences from the requested scope. A lower total may reflect different removal, flashing, access or warranty provisions rather than equivalent work.
WORKING AROUND RESIDENTS
Identify entrances, accessible routes, emergency access, balconies, parking and any unit or attic access needed. Agree on how the authorized council or manager contact will distribute notices and handle resident questions.
Discuss noise, odours, deliveries, temporary restrictions and weather updates before work begins. Set work hours within City requirements and applicable strata rules. Normal access may need to change during specific operations.
SURREY SITE ARRANGEMENTS
Check space for bins, materials, scaffolding and lifting equipment. Use of a street, sidewalk or other City property can require permits. Confirm who arranges them and allow for approvals before deliveries.
Where workers from two or more employers will be present, confirm the prime contractor arrangement and safety coordination responsibilities. In BC, the owner generally holds that role unless a written agreement designates another party. Each employer retains duties to its own workers.
MULTIPLE BUILDINGS OR BUDGET STAGES
Phasing may suit separate buildings or defined roof areas when their condition and connections allow it. Identify the boundaries, temporary and permanent weather protection, access arrangements and risks of delaying the remaining work.
Repeated mobilization can affect total cost. Future material prices and schedules may differ from the first phase. Ask for each stage’s scope, assumptions and decision deadline, and keep interim maintenance separate from the replacement contract.
FROM CONTACT TO COMPLETION
Provide the address, roof concerns, available reports and the decision the council needs to make.
Confirm safe access, the assessment scope, any fee and reporting needs. Identify limitations and further investigation where needed.
Compare materials, details, inclusions and exclusions. Confirm funding authority and who may approve changes before accepting the work.
Coordinate notices, work areas, deliveries, permissions and scheduling. Agree on communication when weather or hidden conditions affect the plan.
Paragon’s own crews carry out the roofing work with owner involvement. Document newly found conditions and obtain the agreed authorization for additional work.
Review the agreed scope and any remaining items. Retain the invoice, agreed photographs or records, warranty documents and maintenance requirements.
COUNCIL & MANAGER QUESTIONS
Confirm the strata’s responsibility for the roof, its funding approvals and the authority delegated to the council or property manager. A contractor’s quote does not establish spending authority. The applicable process can differ for reserve fund spending, special levies and changes to common property.
It may. A significant change in appearance or use of common property can require an owner vote, and other project approvals may apply. Review the proposed change with the strata manager or legal adviser and confirm City requirements before committing.
No blanket answer applies to every project. BC requirements distinguish the work being undertaken and include conditions and exemptions. Have the project consultant confirm applicability with BC Housing, particularly where the scope includes remediation of water penetration damage or broader envelope work.
Tell us the meeting date and what the council needs to review. We can discuss the written scope and supporting information required. Confirm presentation format, attendance, timing and any associated fee in advance.
The schedule depends on the number of buildings, roof areas, system, removal, access, weather and hidden conditions. Ask for a project specific sequence and expected disruptions after the scope and access arrangements are established.
Many roofing projects are planned around occupied buildings, but the actual operations determine access restrictions and protection measures. Review entrances, balconies, ventilation, noise, odours and emergency routes. Do not assume every area can remain in normal use throughout the work.
Confirm the exact workmanship and manufacturer warranty terms in the proposal and final documents. Review coverage, exclusions, maintenance obligations, registration and transfer conditions. Manufacturer coverage depends on the selected system and eligibility; do not assume every option has the same protection.
CUSTOMER EXPERIENCES
Read customer feedback and discuss the scope your building needs.
YOUR NEXT STEP
Tell us which buildings need attention, what the council has reviewed and when the next decision is due. We can discuss the assessment and information needed for a written replacement proposal.
For a new construction project, share the plans, specifications and intended schedule so the installation scope can be reviewed.
Read the Surrey strata roofing guide or browse Surrey roofing guides for more detail on systems and maintenance.
Paragon Roofing BC
Updated November 7, 2026
View our Better Business Bureau profile for business information.
997 Seymour St Suite 250, Vancouver,
BC V6B 3M1, Canada
Email: contact@paragonroofingbc.ca
Mon - Sun: 6AM-6PM
All Rights Reserved | Paragon Roofing BC | SEO by Piiper Digital Solutions | paragonroofingbc.ca is owned by 1554859 B.C LTD